Cromoplastica

Italiano English Français Deutsch

Production Sites


Cromoplastica has installed two galvanic lines and a moulding shop into the production site of Verdellino (Bg) and one galvanic line into the production site of Ciserano (Bg).

The distance between the two sites is approximately one Kilometer. Each site has its own lab with dedicated qualified employees to monitor the quality of the output.